Location:
St. Louis, MO
Challenges:
Big project to mobilize, used engineered (elevation) scaffolding on the job – safely. Difficulty in access and staging – pedestrian traffic. Historical tax credit, had to be done to specification. Replacing deteriorated, compromised steel at shelf angles; 65,000 square feet were glazed in this project.
General Contractor:
Paric